Completed Projects

Our Projects

We also design, carry out Erection, Operation and Maintenance of all kind of Industries and Power Stations. We carried out Electrical Mechanical erection at following Industries in:

S.NO NAME OF COMPANY PROJECT DETAILS
01 Descon Engineering Limited As vendor Electrical Mechanical installation of their major projects
02 Tata Energy Kotri Mechanical Electrical installation of 3 MW Power Plant
03 Amin Textile Mills Kotri Electrical installation from Designing to Commissioning
04 Surriya Textile Mills Kotri Electrical installation from Designing to Commissioning
05 Shadman Textile Mills Kotri (As Electrical Consultant)
06 Haji Ismails Mills Kotri (As Electrical Consultant)
07 Ayesha Textile Mills Ltd Shaikhpura Electrical installation from Designing to Commissioning
08 Amin Textile Mills Unit -2 Shaikupura Electrical installation from Designing to Commissioning
09 Ayesha Textile Mills Ltd Unit-2 Shaikhpura Electrical installation from Designing to Commissioning
10 Uni – Col Distillery plant Mechanical Up-Gradation of 20 tph boiler
11 Bashir Cotton Mills Nankana sahib Electrical installation from Designing to Commissioning
12 Fateh Group (Hyderabad) As Technical Director Electro-Mechanical
13 Fateh Spinning Mills 1 & 2 Operation General Manager
14 Fateh Coal Mines Lakhra As Technical Director
15 Barkat Power Limited Electrical Mechanical installation of 4 MW Power Plant
16 Barkat Weaving Operation General Manger
17 Fateh Motors Electrical Consultant
18 Fateh Textile Mills Operation General Manager
19 Sapphire Textile Mills i. Mechanical & Electrical installation of 3 MW 2 Nos. Jenbacher J420 Gas Generators
ii. Rectified and commissioned 0.5 MW Steam Turbine powered by WHRSG (Waste Heat Recovery Steam Generation)
20 Lasbela Industrial Estate Development Authority at Hub Baluchistan As an Electrical Consultant Obtained a 60 MW Electric Distribution License from NEPRA. For the entire LIDEA (Lasbella Industrial Development Estate Authority) Enabling them to sell electricity within their jurisdiction
21 Byco Refinery Hub Baluchistan (50 TPH Boiler Mechanical & Instruments installation)
22 Gadoon Power Project Installation and Alignment of 5 MW Steam Turbine powered by WHRSG (Waste Heat Recovery Steam Generation)
23 Chevron Karachi i. Mechanical, Electrical & Instrumentation installation of 6 TPH Boiler
ii. Electrical Mechanical Up-Graduation of existing 6 TPH Boiler including induction of PLC
24 Galaxy Power (Jhang) Erection and synchronized with FESCO 11 KV consist of Janbachar F 620 series 4 X 3.1 MW
25 Rafhan Maiz (Continuous mechanical maintenance contract)
26 HYTEX ENERGY (Pvt.) Limited Installation of 1.5 MW Coal Fired Power Plant as EPC Company
27 Rohri Cement Factory carried out the erection of a 5 MW Gas Fired Power Plant
28 Zealpak Cement Factory Carried out erection of 7 MW HFO Fired Power Plant

Moreover, it is common knowledge that due to power crises & high prices of fuel in country, every sector is affected. In order to overcome the crises, we are striving to contribute some share in economy of Pakistan by offering Co-Generation Plants (Waste Heat Recovery System), and Solar Energy We are experts in designing of Customized projects. Some of our ongoing Solar Projects (Joint Venture with VTECH Private Limited) are as under:

01 Baber Farms Installed 30 KW Solar on Tube Well
02 Toyota Hyderabad Motors Installed 100 KW Solar Energy
03 Super Star Motors Multan Installed 100 KW Solar Energy in pipeline
04 Uneeq Motors Installed 300 KW Solar Energy in pipeline